×

Make an Enquiry


Enquire

Share

Installation and Commissioning

Installation and Commissioning

After the Factory Acceptance Test, with the assistance of our engineers, the system is installed, cabled and commissioned in full compliance with industrial guidelines. It is handed over to the customer after successful completion of the Site Acceptance Test (SAT).

Services

  • Installation and Cabling
  • Loop Tests
  • Commisioning (Including system integration, device configuration and testing)
  • Site Acceptance Test (SAT)
  • Handover of complete documentation
  • Training of Staff